22
| 12th - 18th September 2014 | UtILItY WeeK
Operations & Assets
High viz
D
wr Cymru Welsh Water has
installed a new water manage-
ment system at its Pontsticill
reservoir as part of a £1.5 million
upgrade programme to the water
works located there.
Large stirrers of approximately 5
metres in diameter, manufactured by
Wears Australia, were shipped 10,333
miles to the UK from Toogoolawah
in Queensland, before being assem-
bled on the banks of Pontsticill and
In-depth solution