Network

Network JulyAugust 2016

Issue link: https://fhpublishing.uberflip.com/i/703545

Contents of this Issue

Navigation

Page 2 of 39

NETWORK / 3 / JULY/AUGUST 2016 T H E G R I D JULY/ AUGUST £28m The amount of funding available via new two new Innovate UK competitions focused on novel ways of achieving affordable, sustainable and secure energy and for the integration of energy and transport to tackle the challenges of modern urban living. "We dispatched DSBR and automatically, demand response was linked to an energy problem… that led, unfortunately, to an old narrative in which demand side is only used when we're really in trouble." Cordi O'Hara, director of UK system operator, National Grid NETWORKS.ONLINE "I would particularly home in on interconnection as far as what I think is going to be a real Brexit problem." ALAN WHITEHEAD, FORMER SHADOW ENERGY MINISTER, IS INTERVIEWED, P6 Brexit impact EDITORIAL Editor Jane Gray, t: 01342 332087, e: janegray@fav-house.com Deputy editor Lucinda Dann, t: 01342 332083, e: lucindadann@fav-house.com Utilities content director Ellen Bennett, t: 01342 332084, e: ellenbennett@fav-house.com Production controller Sharon Miller, t: 01342 332054 Business development manager Helen Smith, t: 01342 332109 e: helensmith@fav-house.com Business development director Ed Roberts, t: 01342 332067, e: edroberts@fav-house.com Membership manager Peter Bissell, t: 01342 332057, e: peterbissell@fav-house.com Brand marketing manager, utilities Ben Parker, t: 01342 332103, e: benparker@fav-house.com Publisher and chief executive Amanda Barnes, e: amandabarnes@fav-house.com General enquiries 01342 332000 Printed by Buxton Press Palace Road, Buxton, Derbyshire SK17 6AE Published by Faversham House Ltd, Windsor Court, Wood Street, East Grinstead, RH19 1UZ NETWORKS.ONLINE "IT HAS BEEN ESTIMATED THAT GREATER ENERGY EFFICIENCY, INCREASED RENEWABLES AND NEW NUCLEAR GENERATORS MEAN THAT THE REQUIREMENT FOR PRIMARY FREQUENCY RESPONSE WITHIN 10 SECONDS COULD EXCEED 2GW IN FUTURE." ANDREW HOWE, DIRECTOR, LEVEL ENERGY NETWORKS.ONLINE £27m The cost of the latest tunnel to be completed by UK Power Networks for added capacity in London NETWORKS.ONLINE 63% Carbon emissions cut during SSE's district heating pilot in Wyndford, Glasgow NETWORKS.ONLINE "I FEEL LIKE [THE REFERENDUM RESULT HAS] ALMOST CERTAINLY DIMINISHED OUR ABILITY TO USE INTERCONNECTORS TO HELP US WITH BALANCING." PROFESSOR PHIL TAYLOR, NEWCASTLE UNIVERSITY

Articles in this issue

Links on this page

Archives of this issue

view archives of Network - Network JulyAugust 2016