Utility Week

Utility Week 28th February 2014

Utility Week - authoritative, impartial and essential reading for senior people within utilities, regulators and government

Issue link: https://fhpublishing.uberflip.com/i/266932

Contents of this Issue

Navigation

Page 23 of 31

utILIty WeeK | 28th February - 6th March 2014 | 25 Operations & Assets Market view D riven by increasing demand, water security is a growing issue and, although water may currently flow abundantly from our taps, it is a valuable resource and our future supply needs to be safeguarded. In December 2013, Bristol Water submit- ted a planning application for a 9,400 mil- lion litre reservoir in Somerset, near the existing Cheddar Reservoir. This artificial lake, known as the Cheddar Reservoir Two, is an essential part of Bristol Water's long- term water resource plan. It is forecast that the population in Bristol Water's supply area will increase by 36 per cent, from 1.1 million in 2007 to 1.5 million in 2035. The second reservoir, as part of a balanced approach including cutting leakage further, encour- aging water metering and helping custom- ers save water, will help secure a major new water source for 50,000 homes in the local area. Following more than three years of analy- sis, careful planning and the recent submis- sion of the planning application, there are numerous other steps to follow. Alongside seeking approval of the local authority, regu- latory approval is needed from Ofwat, the water industry economic regulator, confirm- ing that this proposal is the best choice avail- able and represents real value for money for customers. Bristol Water worked with Arup from August 2010 to select the optimum site for a new reservoir, assess the reservoir's potential impact and prepare a scheme for its devel- opment. The combined team found a bal- anced solution through local insight and an integrated approach to water management problems. The site for Cheddar Reservoir Two, immediately south of the existing Ched- dar Reservoir and near Cheddar Village, was chosen as the preferred location aer detailed technical studies and stakeholder consultation. Starting with an initial 53 sites, a "long-list" of 36 was established based on practical issues such as topography, envi- ronmental designations and protected sites. The 36 sites were individually investigated against 20 criteria, including ecology, engi- neering construction, visual and access – leaving a shortlist of six. A detailed assessment was undertaken of the shortlisted sites, with trial pits and boreholes, habitat surveys, cultural heritage studies and whole-life costing assessment. The wider economic and social benefits that the scheme could bring to the favoured locations were also considered. The chosen site benefited from good ground conditions, available and suitable material to build the reservoir and good proximity to the existing water supply network. The site also offered the opportunity to enhance the social and ecological amenity of the area. Bristol Water had a strong vision for the scheme, which was to ensure the security of future water supplies, but also to incorporate a wide range of social, environmental, amen- ity and recreational opportunities for the sur- rounding area. Extensive environmental surveys and studies were undertaken to baseline the environmental impact assessment, and to influence the masterplan. For example, the reservoir footprint was aligned to safeguard mature trees and hedgerows, accommodate utilities and a river diversion, along with pedestrian, cycle and disabled driver access. An extensive archaeological investiga- tion including geophysics surveys and trial trenching investigated this potentially rich archaeological area. This resulted in the pro- posed reinstatement of a 17th Century Duck Decoy (originally a structure for capturing wild ducks for food) as an integral part of the masterplan. Although the location selected for the reservoir offers a range of benefits, it also poses unique challenges. Sitting partially within the Environment Agency's Flood Zone 3, compensation for the floodable area lost is needed. This will involve slightly lower- ing ground levels across an area adjacent to the reservoir to increase the flood storage volume of the available land. However, this area serves multiple purposes because it was designed to encourage biodiversity, provide a habitat for local wildlife and create a quiet amenity space for visitors. The local community has played an important part in the process. A consultation plan was drawn up in discussion with Sedge- moor District Council, and a two-stage con- sultation strategy implemented. This allowed views and ideas to be openly expressed, con- sidered, and where appropriate incorporated within the masterplan. Each stage included three days of public exhibition and design workshops with community representatives and statutory authorities. The design solution avoids adverse impacts, integrates mitigation and responds to the opportunities for environmental enhancement. Arup supported Bristol Water with this planning application by bring- ing together a team of specialists in pro- ject management, town planning, public consultation, reservoir design, landscape design and environmental assessment. Arup implemented a project structure that integrated disciplines and progressed with work in managed phases. This approach, coupled with close co-operation with Bristol Water staff throughout, encouraged inter- disciplinary collaboration to resolve issues and pursue opportunities in a timely man- ner. The planning application is currently being considered by Sedgemoor District Council, and a decision is expected later this year. Phil Hodgson, project manager, and Rick Grosfils, design lead, Arup For further details please visit the project website at http://cheddar-reservoir-two.co.uk/ Something in reserve Bristol Water's proposed Cheddar Reservoir Two is a major part of the company's long-term water resource plan. Phil Hodgson and Rick Grosfils look at some of the detailed work behind the plan. Cheddar Two will lie just south of Cheddar One

Articles in this issue

Archives of this issue

view archives of Utility Week - Utility Week 28th February 2014