Water & Wastewater Treatment

WWT April 19

Water & Wastewater Treatment Magazine

Issue link: https://fhpublishing.uberflip.com/i/1094482

Contents of this Issue

Navigation

Page 11 of 47

12 | APRIL 2019 | WWT | www.wwtonline.co.uk www.teekaycouplings.com tel: +44 (0)1494 679500 Manufactured and tested to BSEN 1917:2002 and BS5911-3:2002 Perfect Watertight Joint Perfect Base Perfect Hydraulics .....everything flows! The Perfect Manhole System Build Faster Build Leaner Build Greener Build Quality Build Smarter Build to Last The Perfect Manhole System delivers up to 40 % savings on GHG emissions compared with traditional build. The Perfect manhole take off tool is available from our website. With over 20,000 Marshalls CPM perfect bases now supplied to the construction industry are you being left behind in manhole assembly? Proven to deliver faster installation with perfect hydraulics, the Marshalls CPM Perfect Manhole has no requirement for a concrete surround and is available pre-benched within days of requisition or as a plain base. Designed and manufactured from high quality durable concrete with a minimum 120 year design life the Perfect Manhole is the talk of the industry. T: 01179 814500 F: 01179 814511 E: salesemail@marshalls.co.uk www.cpm-group.com

Articles in this issue

Links on this page

Archives of this issue

view archives of Water & Wastewater Treatment - WWT April 19