Network

Network JulyAugust 2017

Issue link: https://fhpublishing.uberflip.com/i/846256

Contents of this Issue

Navigation

Page 21 of 31

NETWORK / 22 / JULY/AUGUST 2017 T he days of substations filled with copper cable are coming to an end. Smart grids need smart communications, and peer-to- peer communication within and between substations is set to quickly become business as usual for UK power networks. Facilitating this transition is IEC 61850, a standard launched in 2004 and updated in 2011, which provides a new approach to automation and communication in substations. IEC 61850 is a single pro- tocol for substation automa- tion that allows devices from different vendors to talk to one another directly over an Ether- net connection that operates in a similar way to a local area network (LAN). It is divided into several parts dealing with issues such as data, com- munications and compliance. In this CPD-accredited article, produced in association with Schneider, Network looks at the latest developments in peer-to- peer communications for power networks. IEC 61850 and the revolution in substation communications CONTINUING PROFESSIONAL DEVELOPMENT

Articles in this issue

Archives of this issue

view archives of Network - Network JulyAugust 2017