Water & Wastewater Treatment

Pumping station 2017

Water & Wastewater Treatment Magazine

Issue link: https://fhpublishing.uberflip.com/i/801552

Contents of this Issue

Navigation

Page 7 of 23

8 The PumPing STaTion - PumP and ValVe SuPPlemenT 2017 Overpumping solution helps Anglian sludge management Case study A business critical temporary pump solution was required at Anglian Water's Water Recycling Centre in Caister, Norfolk, in order to manage return activated sludge levels during infrastructure maintenance. The waste- water treatment processes at Anglian Water's Caister Water Recycling Centre rely on careful management of the return activated sludge (RAS) in the final settle- ment tanks. Rich in enzymes that help to clean the water and remove unwanted bacteria, the RAS is critical to both the first and final elements in the wastewater treat- ment process. A sludge blanket needs to be managed at the correct levels in the final settle- ment tanks to maintain and improve the water quality before it is released into the watercourses. The RAS content required in the final settlement tanks varies depending on the throughput of wastewater at the facility. Meanwhile, the RAS that is not required in the final settlement tanks is returned to the primary processing tanks at the head of works as an essential com- ponent in beginning the processing cycle. Too much RAS in the final settlement tanks, or too little in the initial processing, could have a critical impact across the whole water recycling centre. When routine maintenance was required to the adjustable bellmouths used to control the amount of RAS taken from the final settlement tanks and returned to the head of works, Anglian Water needed a temporary overpumping solution that would enable the bellmouths to be taken off line, while ensuring that the correct levels of sludge were returned to the head of works and maintained in the final settlement tanks. As a category A supplier to Anglian Water, IOS (Integrated Operational Solu- tions) developed a suitable solution and, following a site visit to fully assess the requirements, six duty pumps were specified for the overpumping require- ments, with an additional three pumps provided to site as standby units. Overpumping connection Sykes Pumps deployed six Super Wispa- set 200 8" diesel pumps, each with a flow rate of up to 580m 3 per hour, with one each at final settlement tanks 1,2,3 and 4. An additional two Super Wispa- set 200 pumps were installed for standby use. For tanks 5 and 6 where the required flow rate was lower, a 6" Super Wispaset 150 pump was specified for each tank, with a further 6" pump installed as standby. The pumps were supplied to site with four fuel tanks, 174m of 8" wire armour hose, 84m of 6" wire hose, 84m of 8" polyurethane piping and 42m of 6" pol- yurethane piping. This enabled Anglian Water IOS to connect the pumps to the existing pipework so that sludge could be pumped directly into the network for transferring RAS from the final settle- ment tanks back to the head of works, while bypassing the chambers where the bellmouths are located during the repair works. The fuel tanks ensured that the pumps could run constantly over the course of the overpumping operation without risk of interruption, while daily site visits from Sykes Pumps technical team ensured that the pumps were checked and in excellent working order at all times. Managing the flow As the bellmouths are usually used to control the flow of the RAS from the final settlement tanks, management of the flow rates had to be built into the over- pumping installation. Anglian Water's engineers fitted control valves into the pipe gallery below ground and these were manually connected to a tempo- rary piping manifold and operated via an iOS control system. Anglian Water's IOS site team was then able to adjust the flow by monitor- ing sludge blanket levels using teleme- try technology installed on all the pumps as part of the pump hire specifi- cation. This allowed 24/7 remote moni- toring of flow rates so that these could be adjusted in real time if the sludge blanket needed to be increased or reduced. Due diligence Although the pumps were on hire for two weeks, the overpumping operation itself was required for just three days while the RAS lanes were out of commission. The overpumping was so process criti- cal, however, that significant due dili- gence was involved in the specification and installation stages, with a week invested in installing, commissioning and testing the overpumping capability before management of the RAS was transferred to the temporary set up. Decommissioning was a similarly metic- ulous process, carried out over the course of a week following the reinstate- ment of the bellmouths. The project was successfully com- pleted in February with zero risk of pro- cess interruption throughout. By Rob Richards Sykes Pumps

Articles in this issue

Archives of this issue

view archives of Water & Wastewater Treatment - Pumping station 2017