22
| 1ST - 7TH APRIL 2016 | UTILITY WEEK
Operations & Assets
High viz
The first Nova M100 turbine of the
Shetland Tidal Array delivered power
this month to the Shetland grid aer
a successful winter of operations and
testing. The array is a joint enterprise
between Nova Innovation (Scotland)
and Elsa (Belgium). Phase 1 of the
array consists of three 100kW Nova
M100 turbines, with two more turbines
planned in following phases.
The tide turns
for Nova