Alastair Moseley, Future Water Association, talks innovation/ P14
Speedy pump engineering helps resolve sink hole drama / P21
The TWENTY65 project and meeting water's grand challenges / P29
How HDPE pipes were taken to new lengths for the Lee Tunnel outfall
Plastic Fantastic
APRIL 2016 WATER & WASTEWATER TREATMENT Volume 60 | Issue 4 | wwtonline.co.uk
THE
PUMPING
STATION
PUMP
AND
VALVE
SUPPLEMENT
INCLUDED