WET News

WN January 2016

Water and Effluent Treatment Magazine

Issue link: https://fhpublishing.uberflip.com/i/615834

Contents of this Issue

Navigation

Page 9 of 27

Techknow • The modular steel kiosk offers most scope to adapt aesthetics and functionality • Modular steel mesh enclosures allow different permutations of anti-climb protection • Flat-pack kiosks are assembled from scratch and are the best option where access is difficult UltraSecure solutions reduced off-line time on security upgrades at this water treatment site from four weeks to just one day 10 weT newS JANUARY 2016 S ince the distant days of AMP2, when certificated secure access covers for potable water reserves were de rigueur, asset hardening in UK water has reached many more areas. Twenty years on, security engineering in AMP6 is flexing to even bigger challenges. The super-size kiosk is now emerging as the new king of the water site. Demand is growing for ever larger, modular enclosures to upgrade the protection of ever larger installations, both new build and existing. These typically include water treatment plant, telemetry, chlorine dosing, valves, switchgear and power supplies, where disruption from unauthorised entry, criminal attack or terrorist activity could have serious impacts on operational efficiency and customer service. Suppliers like Technocover have evolved versatile supply options for modular buildings, helping contractors to overcome difficult site constraints, keep programmes on track and, above all, demonstrate the cost- efficiencies required in the era of totex. Early collaboration is essential in screening site logistics, operational needs and the construction schedule to pinpoint which type of build – offsite, onsite and even pre- fitted M&E – will be most cost- effective. Some applications are seeing ready-built kiosks being craned straight over existing plant or buildings: precision- engineered 'tea cosies', providing fast track hardening of the asset with minimised downtime. Carefully planned, prefab-ricated structures can shave days, even weeks, off site build time, helping to keep con- struction programmes on track or even ahead of deadline. Pre-built UltraSecure steel security enclosures significantly reduced operational downtime during asset hardening on a recent utilities project. Technocover designed and assembled the LPCB approved kiosk and cabinets for craning directly over existing installations, fast-tracking security enhancements at the water treatment works. With the largest at 8.7m long by 5.3m wide by 3m high, each unit was 3D modelled and precision manufactured to fit snugly around infrastructure with minimal extension of footprint. Potential outage The 'drop-on' solutions helped main contractor and integrated consulting and construction company Black & Veatch to reduce off-line time of upgraded installations from four weeks to just one day. While minimising operational impact for their client, it avoided both the time and cost to dismantle and dispose of existing housings, and strip out and reinstall internal equipment. Technocover delivered and assembled components for the large kiosk away from the asset. It was then lišed into position for fixing to the foundation and fitting with compatible LPCB- approved doors and locking systems. This simplified required works on site to the addition of a narrow concrete slab around the existing kiosk and reinstallation of alarm systems to the new structures. The pre-build also removed the need for scaffolding for in-situ construction, with all the attendant work at height issues and finding suitable flat ground to stage it. Colin Miller, Black & Veatch project manager, said: "Techno- cover's solution reduced the potential outage time spent on the asset to one day, so that the upgrade work could progress with minimal risk and intrusion on normal operations." Technocover has previously supplied other LPCB-certificated security products to the same site, including UltraSecure doors, access covers, louvres, barsets, grilles and mesh gates. Early collaboration also Upsizing security – and the rise of offsite assembly ONSITE SecURiTY provides opportunity for the security specialist and contractor to consider features that can enhance operational efficiency during service life, and deliver long term returns for totex accounting. In this case, the modular steel kiosk offers most scope to adapt aesthetics and functionality within the realms of LPCB certification. Internal dividing walls and doors can be incorporated within the design along with outward opening single or twin doors with optional security matched vision panels and louvre vents. Numerous certified door entry and exit control options are available, as well as other operational features such as roof access covers or hatches. For some applications, 'flat- pack' kiosks which are assembled from scratch will remain the best option. This will be most likely where access is difficult, typically at remote, unmanned sites or locations where installation space is hampered by other structures. Such scenarios may preclude the possibility of getting the delivery vehicle close enough to crane liš large kiosk sections or complete units. Protected asset Also growing in use are modular steel mesh enclosures, allowing many different permutations of anti-climb protection. These range from a simple two-sided structure against an existing building, to a full, stand-alone five-sided structure (with roof) providing secure encapsulation of existing buildings or processes. Mesh cages have the advantage of providing visibility of the protected asset at all times, and excellent free airflow around vented installations. They are equally suited to internal or external use, with options for single or twin gates to accommodate the movement of plant or materials in or out of the enclosure. Being constructed of steel, they also provide greater scope for adaptation, such as the option of sliding doors, a feature exclusive to Technocover. Due to site management needs, vehicles making deliveries were required to park directly alongside the kerb closest to the asset. With the cage bringing structures closer to the road, and with no scope for an inward opening door, a sliding door was devised. This was an innovation dictated by site logistics and management protocols, identified early on thanks to a detailed survey and pre- planning. Without this, untold programme and cost impacts would have resulted. Offsite prefabrication engages the project team and supplier in a more holistic view of the site, logistical and programming considerations that need resolving in achieving successful, right-first -time outcomes. When M&E is also part of the offsite build, it provides an opportunity to better coordinate elements vital in achieving a fully operational facility. Construction design and services fit-out are procured separately, with a greater risk of mismatches and error. Hence the increased demand for factory-assembled, 'plug and go' security kiosks which are fully fitted-out prior to delivery with all required M&E. On site, they simply need bolting to the slab and connection to mains power, saving labour and programme time. This sees the management and certification of complex fit- outs transferred to the quality- controlled environment of the factory, under the responsibility of one supplier. It also relieves some of the burden of site health and safety. This super-size capability offers unprecedented scope for supply chain partners to push the envelope in security engineering, and harness every advantage in delivering slicker construction and totex cost-efficiencies. • Water's current focus on cost efficiency, innovation and supply chain collaboration is bringing new meaning to 'outside the box' thinking. The VeRDIcT "The solution reduced the potential outage time spent on the asset to one day, so that the upgrade work could progress with minimal risk and intrusion on normal operations" neeD To know • The first phase of the ciP programme in 2011. carefully planned, prefabricated structures can shave days, even weeks, off site build time • The pre-build removed the need for scaffolding for in-situ construction • As much as 95% of the build can be done in the factory LPcB-approved mesh cages provide anti-climb, naturally vented security of plant. PRoJecT SPecS • Design and assemble kiosk and cabinets for craning directly over existing installations • Minimising operational impact for clients

Articles in this issue

Archives of this issue

view archives of WET News - WN January 2016