TECHNICAL INFORMATION
291
UTILITY WEEK ENERGY SUPPLY HANDBOOK 2014
Name Fuel Capacity Number of sets Start up Tel
MW
l
Taff Ely Wind 9 20 x 450kW 1994 01793 474148
l
Tow Law Wind 2.3 3 x 770kW 2001
l
Trysglwyn Wind 5.6 14 x 400kW 1996
l
Windy Standard Wind 21.6 36 x 600kW 1996
RWE Npower plc
Aberthaw Coal 1,620 3 x 522MW + 1971 01446 750271
3 x 18MW OCGT
Aylesford CHP Cogeneration 98/ 2 x GT + 1 x ST 1995 01622 796438
120t/hr
Bridgewater/Cheshire CHP Cogeneration 58MWe, 1x GT + 1 x ST 1999 0151 373 4100
290MWth
l
Conoco Phillips Cogeneration 6.2/20th 1 x GT 1996 +353 21 4622296
l
Cowes OCGT 140 2 x 70MW 1982 01983 292911
Didcot A Coal/gas 2,000 4 x 500 1972 01235 512291
Didcot B CCGT, natural gas 1,480 1 x 780 + 1 x 700 1998 01235 845200
Didcot B CCGT 1,360 2009 01235 845200
Dow Corning Ltd Cogeneration 26.0/220th 2 x GT + 1 x ST 1998/99 01446 730621
Fawley Oil 76 2 x 484 + 4 x 19 OCGT 1969 023 8024 5600
Great Yarmouth CCGT 400 1 GT + 2002 01493 847300
1 ST on single shaft line
Grimsby CHP Cogeneration 13 1 x GT (13MW) 1 2001 01472 348294
x ST (9MW) currently
removed from service
long term
l
INEOS Cogeneration 80 1 x 40MW GT + 1997 01642 546866
1 x 40MW ST