Water & Wastewater Treatment

August 2014

Water & Wastewater Treatment Magazine

Issue link: https://fhpublishing.uberflip.com/i/356681

Contents of this Issue

Navigation

Page 7 of 51

8 | august 2014 | WWt | www.wwtonline.co.uk priority issue climate change presents – flood risk management. Last winter was a real howler: the wettest since records began, with 12 major storms hitting over Christmas and the biggest tidal surge since 1953 on the east coast. More than 7,000 properties flooded and the EA took as great a battering in the media, suffering headlines such as The Spectator's February offering on the Somerset Levels situ- ation: Floods of incompetence – why Chris Smith should resign from the EA. Smith accepts the difficulties of handling the emergency – "that's not a period I would relish going through again, but that comes with the territory; we deal with extreme weather". But he says the episode neverthe- less marked the low point of his six years in post. "My low would certainly be, not so much dealing with the flooding emergency it- self, but coping with some of the ill-informed media coverage at the time." Looking back he staunchly defends the EA's record, arguing its flood defence work since 2007, the temporary defences it in- stalled in the face of the emergency and the hard work of around 4,500 staff saved many thousands more homes from succumbing to the water. Playing second fiddle to these too much/ too little water issues is the still-important matter of water quality. The country can be proud of its achievements on bathing water quality: this has risen steadily since 1988; 99% of bathing waters meet mandatory standards and 90% meet the higher guideline standard that will from next year become the base measure. However, our performance against Water Framework Directive (WFD) demands is poor. As of the end of March, only 27% of water bodies in England met the required "good ecologi- cal status" criteria, down from the 2013 score and below the 32% target. Water company trade body Water UK is lobby- ing for greater accept- ance of derogations, less stringent standards and more time. Galvanises action Smith sympathises with the need to revisit the directive's demands, and says he expects change will come – in time. He observes: "In my view there are two fundamental problems with the WFD. The first is it is ultimately unachievable. To think that we could achieve good ecological status for every single water body in England - it's not going to happen. It's sort of physically impossible… So does it make sense to have something on the statute book that you know is unachievable? And it will be unachiev- able for every single European country." He accepts the directive's existence galvanises action, but says this pressure could be main- tained with more realistic set targets. He continues: "The other big problem for me with the WFD is the 'one out, all out' provision." This states if a water body fails on even one parameter, it isn't classified as of good status. Smith argues this incentivises "making the almost-good good rather than tackling the really terrible water quality rivers where you could make a significant improve- ment, probably making a big improvement to peoples' lives who live around those rivers. In my view those are the ones that should have priority." Back on home turf, Smith has confidence in the basic structure of the UK water industry in the face of growing challenges. "I don't see a great need to disrupt the format of water management in this country - having inde- pendent water companies, having Ofwat as economic regulator, ourselves as environmen- tal regulator. That's a system that broadly has worked well." He is "hopeful" PR14 will deliver the EA's environmental ambitions for 2015-20 and that a low cost of capital will mean green goals don't have to be sacrificed to keep bills affordable. He comments: "I'm sure cost of living issues will be playing quite strongly in Ofwat's mind and I think we'll find they've been driving a rather tough deal. But hopefully that can be achieved without sacrificing some of the particular envi- ronmental objectives that we have." However he adds: "The issue that's still a little bit, I suspect, up in the air is the Thames Tideway Tunnel because that's a major cost. In my view it is essential if we are to stop pouring raw sewage into the River Thames 20 or more times a year. But it's very expensive and making a judgement about how it falls on the water rate payers of Lon- don and in fact Thames' wider area is going to be a major issue." Finally, Smith says he will watch with interest how one structural change that took place within the EA last year works out: its Welsh operations have been split off and melded into the one-stop-shop environment service Natural Resources Wales (NRW). This new body will play a key role in the Welsh Government's bid to – sustainably – use the country's natural resources to spur economic growth. Smith is keen to see how NRW approaches what he sees as inevitable conflicts between competing environmental objectives. For more on this Lord smith will be delivering the keynote address at WWt's Environmental Water Management Conference on september 24th. Visit www.sustainable-water.co.uk Industry leaders "My low would certainly be, not so much dealing with the flooding emergency itself, but coping with some of the ill-informed media coverage at the time" Path to the top 2008-date: chairman of the Environ- ment Agency Other current board positions: various, in- cluding chairman of the Advertising Standards Authority 2005: made a life peer, as Baron Smith of Finsbury, in the London Borough of Islington 1983-2005: political career in the Labour Party, including as MP for Islington South and Finsbury, secretary of state for culture, media and sport (1997-2001), and various shadow briefs (1992-97). 1978-83: councillor, Is- lington Borough Council

Articles in this issue

Links on this page

Archives of this issue

view archives of Water & Wastewater Treatment - August 2014